Mast & Derick data please download form Catalogue
Mast & Derick
Drillmec manufactures derricks and masts for all applications, and, in addition, packages can be furnished with top drives, motion compensators, racking system, pipe handlers, elevators, top mounted flares and all derrick related equipment for complete packages. Drillmec offers a complete range of masts that can be telescopic, bootstrap, cantilever, and barge mounted units. In the design phase, particular care is given to weight, space, environmental loading conditions and operational capacities.
These are the main features of Drillmec derricks:
- Welded or bolted derricks
- Suitable for triple and quadruple stands accommodation
- Racking board equipped with racker and stand maker systems
Categories: Drillmec, Mast & Derick, OFFSHORE, Oil & Water
Related products
-
Land Rigs
<div class="first column"> <ul> <li>Drillmec’s deep roots in the manufacturing of drilling rigs start back in 1929 and since then continuously improved rig design by raising the pull-up capacity, enhancing safety, optimizing performance and minimizing environmental impact. Drillmec starting from Massarenti & Branham-design produces a full range of land rig packages to satisfy almost any need with successful achievements all over the world. Drillmec understands that drilling contractors objectives and conditions are constantly</li> <li>in flux and require different solutions to achieve results. Drillmec rigs are available in a wide range of specifications in order to fit custom configurations and capabilities</li> </ul> </div> <ul> <li><strong>Land Rigs - Swing Lift Series</strong> Drillmec produces swing lift rigs with raising lines or hydraulic cylinders. The Swing Lift Series is designed for fast and safe rig-up and rig-down, minimizing non-productive time.</li> <li><strong>DM SERIES </strong>( Swing Lift Series, Raising Lines)<strong> </strong> Swing Lift masts and substructures with hook load capacity from 340 to 907 metric tons (750,000 - 2,000,000 lbs).<strong>HSL SERIES </strong>(Hydraulic Swing Lift Series, Hydraulic Raising)<strong> </strong>Hydraulic Swing Lift masts and substructures with hook load capacity from 340 to 680 metric tons (750,000 - 1,500,000 lbs).</li> </ul>Read more -
Top Drives
<div class="row productDescription"> <div class="col-sm-12"> <div id="descr-1" class="descr"> <div class="first column"> <strong>Hydraulic Top Drives</strong>Drillmec manufactures a full range of hydraulic top drives. Drillmec HTD series top drives can be fitted to almost any rig in order to increase the performance and help in operations such as directional or horizontal drilling. Drillmec designs top drive rails and torque tube starting from drawings of the customer rig or from data collected by </div> <div class="last column"> <p class="split">our technicians directly on the rig field. The torque tube provide the connection between the new HTD top drive and the existing rig. The HTD top drive is supplied with an independent hydraulic power pack and controls and with a transportation cradle designed to hold it and help in moving.</p> </div> <strong>Electric Top Drives</strong> </div> </div> </div> <div class="row productDescription"> <div class="col-sm-12"> <div id="descr-2" class="descr"> <div class="first column"> In the oil & gas industry top drive technology is used to increase performance and safety; from Drillmec solid experience in manufacturing hydraulic pipe handling and top drives, we introduce the ETD Series. The Drillmec Electric Top Drive is designed as transportable as well as permanent installed unit for deep drilling rigs with different mast types. The System is powered by an AC motor. The ETD Series is controlled by a separate control panel. <div class="first column"> The standard Top Drive version includes the following items: </div> <div class="last column"> <ul class="split"> <li class="split">Standard washpipe</li> <li>Link-tilt-system with position monitoring designed for high impacts</li> <li>Remote-controlled and manual IBOP</li> <li>Backup Clamp to make up and break the Top Drive drill pipe connection</li> <li>Guide rail system inducing the torque within the mast</li> <li>Electrical service loop</li> <li>Suitable for installation on any kind of mast and derrick</li> <li>Hanger assembly with integrated Counterbalance cylinders</li> </ul> </div> </div> </div> </div> </div>Read more -
Control System & Drilling Instrumentation – Power Control Room
<div class="first column"> Drillmec’s Control Cabins are specifically designed and tailor made for each individual drill floor, from land rig single sit operation up to triple sits control cabins for floaters. Driller Cabin are equipped with air conditioning system and air pressurizing system and all components inside the cabin are designed for safe-area and ex-proof if necessary. It is crucial for rig operators and personnel to have full access to interact with the rig during all drilling operations. DRILLMEC offers also last generation <strong>Cyber Chairs </strong>as an Integrated Drilling Control System allowing the Driller to manage, control and monitor rig floor equipment in four </div> <div class="last column"> <p class="split">PC Panels to ensure safe, efficient and seamless operations.</p> The <strong>Data Mate System (DMS) </strong>provides the rig operator with vital information to manage productivity during drilling and production operations. All the information can be display locally or transmitted to remote for supervisory service or troubleshoorting. Drillmec’s extensive knowledge and experience with drilling and equipment helped us develop innovative tools that simplifies the operator’s job. </div>Read more -
Pipe Handling Equipment
Every rig operator is looking for greater efficiency and safer operations at the same time. Drillmec automated Pipe Handling Equipment accomplishes both in easy to operate and extremely reliable equipment. Power Catwalk & Pipe Shuttle Power Catwalk / Pipe Shuttle are the devices used for moving tubulars in complete safety from pipe racks to drill floor. Bridge Crane Racker Bridge Crane Racker is mounted on runway beams installed inside of the derrick, over the racking area. The lifting arm, equipped with a clamp, can be extended into the path of the traveling equipment and can handle various tubular sizes. The arm is equipped with a safety shear pin and safety cable to prevent damage should a collision occur. The racker can move the tubulars from racking board to well center, and viceversa. The bridge, 200 degree slewing and trolley functions are driven by rack and pinion drives and powered by rig hydraulic power. The control panels will be integrated into: derrick man cabin, driller’s control panel and driller’s assistant control panel. The Bridge Racker controls are configured such that the Racker can be run from a joystick controller on the derrick man control cabin or manually with the manually operated hydraulic controls in the derrick man control cabin, should there be any problems with the electrical controls. The system will be furnished with a complete zone management system to prevent collision between handler elements and travelling equipment. The Bridge Racker uses electrical components suitable for operation in Zone 2.Read more
Reviews
There are no reviews yet.