- Cellar pump + bail nipple + flow line 8”.
- Shale shaker 500 L/Min basket.
- Cement drain line 8” with gate.
- Settling Ram Bottom.
- Pressuremanifold w/ water and mud 3” weld on steel pipe to
mixing mud and filling well.
- Electricitypanel and switch on start/ stop – lighting system.
- Suction Pipe line by on union 8”to mud tank trailer.