The Gamal Abdel Nasser Axis and Al-Obour Axis Interchange Bridge is a key infrastructure project aimed at improving traffic flow and reducing congestion at one of the most vital intersections. The project forms part of Egypt’s ongoing road network and infrastructure development program.
El Gharably Engineering Works
Piling works (Deep Foundations – Piles)
Structural concrete works for bridge foundations
Heavy civil and infrastructure construction
Soilmec SR-625
Soilmec SR-80
Soilmec piling rigs were utilized to execute high-precision bored piling works, ensuring structural stability and compliance with engineering specifications required for major bridge infrastructure projects.
Reduce traffic congestion at the intersection
Improve traffic flow and safety
Support the development of main longitudinal and transverse road axes
Infrastructure Development | Bridges & Roads | Deep Foundation Works