Welcome To El DiDi Group

Al-Wafaa & Al-Amal Bridge – Suez Road

  • Client :Engineering Authority of the Armed Forces
  • Location : Nasr City, Cairo

Project Details:

Al-Wafaa & Al-Amal Bridge is a vital traffic bridge constructed as part of the road development works along Suez Road, aiming to improve traffic flow and eliminate congestion points in East Cairo. The bridge plays a key role in enhancing connectivity and ensuring smooth vehicle movement in this high-traffic area.

Scope of Work

Drilling and piling works for bridge foundations

Deep foundation execution

Supporting civil and structural works

Equipment Used

Soilmec STM-30

Role of Soilmec Machine

The Soilmec STM-30 drilling rig was utilized to execute precise piling works for the bridge foundations, ensuring structural stability and compliance with engineering standards required for major bridge infrastructure projects.

Project Significance

Improves traffic efficiency on Suez Road

Reduces congestion at a critical intersection

Supports East Cairo’s road and bridge infrastructure development